Engineers in hard hats reviewing a plan on a tablet.
Industries · Projects

Construction & Engineering.

From bill of materials to purchasing, site delivery, tool control and project cost monitoring, on one ERP built for contractors.

Solutions we deploy
  • Construction ERP
  • Project Cost Monitoring
  • Procurement & BOM Management
  • Tool & Equipment Tracking
How we help

Operational Challenges We Resolve.

Four of the problems that cost contractors margin, and the solution we deploy for each.

Construction drawings with a hard hat.
  • ChallengeMaterials Bought Outside the Estimate

    Site requests are approved by message, with no link to the bill of materials.

    Our solutionBOM-Driven Purchasing

    Purchase orders are raised from the approved bill of materials, and any excess is flagged before approval.

  • ChallengeCost Overruns Discovered at Turnover

    Actual cost is compared with the budget only when the project closes.

    Our solutionReal-Time Project Cost Monitoring

    Materials, labour, subcontracts and expenses post against the budget as they occur.

  • ChallengeTools and Materials Unaccounted For

    Power tools move between sites untracked, and consumption is not measured.

    Our solutionTool and Consumption Tracking

    Every tool is issued, transferred and returned on record, and material consumption is logged per project.

  • ChallengeProgress Billing Prepared Manually

    Billing is assembled from spreadsheets and delayed by missing data.

    Our solutionProgress Billing From Project Data

    Billing is generated from recorded accomplishment and approved quantities.

And More. Quotations from the bill of quantities, supplier canvassing, goods receipt and inbound deliveries, warehouse-to-site transfers, site visits, retention and variation orders are handled the same way. Tell us the problem specific to your projects.

Discuss Your Requirements
The system in use

A Construction ERP at Work.

What management and staff see day to day. Your screens are designed around your own process.

Project Cost
Tower B fit-out68% of budget used
  • MaterialsWithin budget
  • LabourWithin budget
  • Subcontracts4% over · flagged
Purchasing
Against the bill of materials12 open orders
  • PO-3310 · RebarDelivered · received
  • PO-3311 · CementIn transit
  • PR-0914 · ConduitFor approval
Tools & Equipment
Issued to sites86 items
  • Site A41 items
  • Site B38 items
  • Due for return7 items
Business benefits

Protect Project Margins. From BOM to Turnover.

A construction ERP that gives management budget, commitment and actual cost on every project, and gives project teams faster approvals and controlled site inventory.

For management

Budget Control. Margin Protection.

  • Budget Versus Actual, Live

    Committed and actual cost against the bill of materials.

  • Procurement Control

    Every purchase tied to an approved requirement and supplier price.

  • Project Portfolio Monitoring

    Progress, billing and collection across all sites.

  • Tool and Asset Accountability

    Where each tool is, who holds it and what was consumed.

For project and site teams

Faster Approvals. Controlled Site Stock.

  • Material Requests From Site

    Requisitions are filed on a phone against the bill of materials.

  • Deliveries Checked on Receipt

    Goods received are matched to the purchase order on site.

  • Site Expenses Liquidated Quickly

    Petty cash and expenses are submitted with receipts attached.

  • Drawings and Quantities on Hand

    The approved scope and quantities are available to the team.

Why WCube

One Team. From Assessment to Support.

How we deliver, and what you can hold us to.

  • FitBuilt Around Your Process.We document how your operation runs before we propose a system.
  • IntegrationWorks With What You Run.We connect to your ERP and accounting platform. No replacement required.
  • AccountabilityOne Accountable Team.The same team designs, builds, deploys and supports the system.
  • ScopeWritten Scope Before Any Build.Deliverables, timeline and cost are agreed in writing first.
  • AdoptionTraining Included.Management and staff are trained before go-live.
  • ContinuitySupported After Go-Live.Monitoring, fixes and enhancements under an agreed response time.

Tell us where your operation loses time. We will identify the cause and recommend the first step.

Analyze Your Bottleneck
Solution consultation

Request a Solution Consultation.

Tell us how the process runs today. The first conversation is a requirements exercise, not a demo.

  1. Initial consultationWe walk through the current process, systems and handoffs.
  2. Requirements reviewWhere the time goes, and which interfaces the work would touch.
  3. Written scopeDocumented before anything is quoted or built.